Our team used the proprietary PM 77 Cleaning System to target the inorganic fouling and improve the performance of the filter, restoring the correct pressure to the system.
After safely preparing the site for the three-day project, we prepared the PM 77 solution to the dilution and dosage tailored to the project needs. We then pumped the solution through specially configured hosing into the beds. After an agreed three hours contact time, we removed the solution and applied a neutraliser solution to the bed to increase the pH back to a neutral level (between 6.5 and 9).
Once the asset was empty, the pipework was reinstated by our client, who then undertook backwashing samples to test the efficacy of the works. The results of these tests showed a significant reduction in filter headloss value, from 0.12 bar prior to cleaning, to 0.07 bar after the clean. Prior to the clean, the backwash flow rate did not exceed 145 m3/hr.
After the cleaning, this was successfully increased to 210 m3/hr. The asset was returned to service immediately following collection of the results.